홈 " Production Injection Molding Services

Production Injection Molding Services

Elite Mold Tech builds hardened steel production molds and runs your parts in volume, from tens of thousands to continuous supply. We design every mold for long life and short cycle time, on HASCO, DME, GOST, or standard bases. Standard parts hold ±0.127 mm per ISO 20457, and critical features hold ±0.025 to ±0.05 mm with precision tooling.

What Makes a Mold Ready for Production

A production mold is built to run hundreds of thousands of cycles without losing size or surface quality. That takes hardened steel, balanced cooling, proper venting, and reliable ejection. Every second saved in the cycle and every year added to mold life lowers your cost per part for the whole life of the product.

We take responsibility for the details that control mold life and part cost: cooling layout, venting, cycle time, and automatic production. Our design engineering team plans these before steel is cut.

Parts We Run in Production

자동차 부품

Interior trim, clips, housings, and under-hood parts in glass-filled nylon, PP, and ABS.

소비자 가전 하우징

Enclosures, frames, and buttons with tight fit and clean cosmetic surfaces.

의료 기기 인클로저

Housings and components in medical-grade resins, with full inspection records.

Choosing the Right Mold Steel

The mold steel decides how long the mold lasts and what surface it can hold. These are common choices:

Steel유형최상의 대상
P20Pre-hardenedMedium volumes, large molds, general resins
718Pre-hardened, improved polishMedium to high volumes, better surfaces
H13Hardened tool steelHigh volumes, glass-filled resins, long mold life
S136Stainless, hardenedClear parts, high polish, corrosive resins like PVC

Pair the steel with the right SPI mold class: Class 101 for 1,000,000+ cycles, Class 102 up to 1,000,000, and Class 103 for under 500,000.

Cavities, Runners, and Cycle Time: Where Part Cost Comes From

More cavities: A 4-cavity mold makes four parts per cycle, so each part costs less. The mold costs more up front.

Hot runner vs cold runner: A hot runner keeps plastic molten up to the gate, cutting waste and cycle time. A cold runner costs less to build but leaves a runner to trim or regrind.

냉각: Well-placed cooling channels shorten the cycle, which is often the largest part of part cost.

Automation: Robot take-out and automatic degating keep cycles steady and labor low.

We size cavities and runners to your annual volume, so the mold pays back as fast as possible.

Production Molding Specifications

기능기능
Maximum part sizeUp to 1,016 × 1,016 × 508 mm (40 × 40 × 20 in), depending on press and mold design
리드 타임4 to 8 weeks for tooling, followed by continuous production cycles
General tolerances±0.127 mm (±0.005 in) per ISO 20457 and DIN 16742
Precision tolerances±0.025 to ±0.05 mm (±0.001 to ±0.002 in) on critical or mating features
Minimum feature sizeAbout 0.25 to 0.5 mm (0.010 to 0.020 in)
벽 두께1.0 to 3.0 mm (0.040 to 0.120 in) recommended
초안 각도1° to 2° per side minimum; more for textured or deep parts
Mold basesHASCO, DME, GOST, and standard bases

From First Shot to Approved Production

Mold design review: You approve the mold layout, gates, and cooling before steel is cut.

T1 sampling: The first shots are measured and sent to you for review.

Tuning and T2: We adjust steel and process until every dimension is in tolerance.

Process validation: We lock the process window and document it, with PPAP on request.

Mass production: Parts run with in-process checks and batch inspection.

Mold care: We clean, maintain, and store your mold between orders.

Quality Control at Volume

Learn more about our quality assurance system.

Materials for Production Molding

Group자료
열가소성 플라스틱ABS, polycarbonate, nylon (PA), acrylic, PVC, polypropylene, PETG, POM (acetal)
고무Silicone, EPDM, Buna-N, neoprene
엘라스토머TPE, polyurethane, nitrile
열경화성Urethane, epoxy, phenolic, polyester resin, vinyl ester

See all resin grades on our plastic injection molding page.

Finishes for Production Parts

Moving From Prototype to Production

Many customers start with prototype molding or quick turn injection molding, then move to production steel once the design is final. The same engineers carry your part through, so lessons from the first mold are built into the production tool. See our full on demand manufacturing options.

Request a Production Molding Quote

Share your 3D file, annual volume, and resin, and we will recommend the mold class, steel, and cavities, with a mold and part price. Your files stay private under our IP protection policy.

연락하기

엘리트 몰드 기술로 디자인에 생명력 불어넣기

엘리트 몰드 테크의 정밀 CNC 가공을 경험해 보세요. 복잡한 프로토타입부터 대규모 생산까지, 당사는 고객의 아이디어를 현실화할 준비가 되어 있습니다. 지금 바로 문의하여 프로젝트에 필요한 사항을 논의하세요!

문의하세요!
12시간 이내에 신속한 응답 보장
🔐 모든 업로드는 안전하고 기밀이 유지됩니다.

프로덕션 몰딩 FAQ

Production tooling usually takes 4 to 8 weeks, depending on part size, cavities, and complexity. Continuous production starts once you approve the samples.

It depends on the steel and mold class. A Class 101 hardened steel mold is built for 1,000,000 cycles or more, while Class 103 molds suit volumes under 500,000.

Hot runners cut waste and cycle time, so they pay off on high volumes and costly resins. Cold runners cost less to build and suit lower volumes. We recommend one based on your annual volume.

Standard parts hold ±0.127 mm per ISO 20457 and DIN 16742. Critical features can hold ±0.025 to ±0.05 mm with precision molds.

Yes. We provide PPAP, CMM reports, and material certificates on request. These are common for automotive and medical programs.

We clean, maintain, and store your mold between orders. You own the mold you pay for.